Repairs to be carried out on the Garadagh-Tbilisi gas pipeline-TURAN
(Read the full article on turan.az)
Georgian Gas Transportation Company LLC will carry out repair work on the Garadagh-Tbilisi gas pipeline from July 1 of this year, the statement reads, TURAN reported.
In connection with the work on the 484-506 km section of the pipeline, there will be restrictions in the provision of natural gas to NASA + LLC, SOCAR Georgia Gas LLC and TAV Urban Georgia LLC (Tbilisi airport).
The length of the Garadagh-Agstafa-Tbilisi gas pipeline with a diameter of 700 mm, built in 1959-60, is more than 511 km.
Jul 2, 2021