(Read full article on oxu.az)
In Baku, on Jalil Mammadguluzade Street, the construction of a new station of the “purple” metro line with the code name B-04 has begun.
The Baku Metro CJSC reported that its construction is carried out using the “wall in the ground” technology, as well as the Memar Ajami and November 8 stations of the same line.
This technology is not only environmentally friendly and economical, but also makes it possible to efficiently carry out construction work in confined spaces.
In accordance with the requirements of this method, monolithic reinforced concrete panels were installed on the site prior to construction. Since then, the construction of two tunnels with a length of 1,010 and 1,021 meters has been completed.